• Increase font size
  • Default font size
  • Decrease font size

Press briefing of Cabinet Decision taken on 2014-10-30
Supply, Installation and Commissioning of 4 Nos. Ship to Shore Container Handling Cranes (STC) and 12 Nos. of Rubber Tyred Gantry Cranes (RTG)

- the East Container Terminal (ECT) is the only terminal out of the three terminals planned under the Colombo Port Expansion Project, expected to be operated by the Sri Lanka Ports Authority (SLPA) in early 2015. The proposal made by H.E. the President, in his capacity as the Minister of Highways, Ports and Shipping, to proceed with the related activities to facilitate the preliminary operation of the ECT, was approved by the Cabinet.