• Increase font size
  • Default font size
  • Decrease font size

Press briefing of Cabinet Decision taken on 2012-10-03
Rehabilitation of National Highways with concrete surfacing through domestic contractors - rehabilitation and improvement of Haputale - Boralanda - Keppettipola Road (B353) from 0 to 27 Km and Meepe - Ingiriya Road (B285) from 0 to 18.13 Km
? Cabinet approval has already been granted to rehabilitate 662.04 km of roads with concrete surfacing through domestic contractors to be financed by local banks. The proposal made by H.E. the President, in his capacity as the Minister of Posts and Highways, to include the above two roads also in the above programme, was approved by the Cabinet.